![]() The Selection Committee may reject all proposals and stop the selection process at any time. Finalists will be provided with a copy of the building program, the latest documentation prepared by the project architect/engineer and a description of the final interview requirements. Selection of finalists for interviews will be made on the basis of construction manager qualifications, including experience and ability past experience bonding capacity record-keeping/administrative ability, critical path scheduling expertise cost estimating cost control ability quality control capability qualification of the firm's personnel, staff and consultants and ability to meet the minority business enterprise participation requirements. Failure to negotiate an acceptable fixed fee for phase one of the contract, or to arrive at an acceptable GMP within the time provided in the agreement may result in the termination of the construction manager’s contract. In phase two of the contract, the construction manager becomes the single point of responsibility for the construction of the project and shall publicly bid trade contracts. If the GMP is accepted, phase two, the construction phase, will be implemented. Phase one services include value engineering, constructability analyses, development of a cost model, estimating, and the development of a Guaranteed Maximum Price (GMP) at the 75% Construction Document phase. ![]() Phase one is pre-construction services, for which the construction manager will be paid a fixed fee. The contract for construction management services will consist of two phases. The estimated construction budget is $19,255,400. Consideration should be given to site design improvements and how this addition relates to Florida A&M University’s National Historical District. The site is surrounded by a remarkably diverse representation of architectural styles in the presence of Sunshine Manor, Tucker Hall, Carnegie Library, Coleman Library and quadrangle which are a portion of the National Historic District. The scope of renovation includes but is not limited to, restoration of the building’s envelope, replacement of the building’s plumbing and air conditioning system, total replacement of electrical wiring, (electrical upgrade), complete roof replacement, asbestos abatement, structural systems upgrades, and correction of life safety, renovation of offices, classrooms, the Charles Winterwood Theater, ADA standards, and technology upgrades. This project consists of renovations to the existing Tucker Hall Building, a 77,536 gsf four-story facility constructed in 1956 with minor renovations ($920,000) in 1977, which houses the following areas of the College of Arts and Sciences: office of the Dean, Economics, History/Political Science, Languages, and Literature. Florida A&M University (FAMU), announces that construction management services will be required for: Project No.: FM-317, Tucker Hall Remodeling/Renovation, Florida A&M University, Tallahassee, Florida
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |